Case Studies
Water Pipelines
![]() |
With more than 4,000 km of mainly four-metre diameter prestressed concrete cylinder pipe (PCCP) in operation, the Man-Made River pipeline is the one of the largest water projects in the world. |
![]() |
Dallas Water Utilities - Condition Assessment Since 2005, DWU has been interested in a condition assessment of the 72" Stuart Simpson line, a nearly 50 year old large-diameter PCCP main, but has faced a lot of challenges. |
![]() |
City of Rockville - Robotic Inspection Pure Technologies (Pure) was contracted to provide a robotic inspection of a critical 24-inch prestressed concrete cylinder pipe (PCCP) transmission line for the for the City of Rockville’s Department of Public Works (DPW). The City’s single 10 mile-long transmission main system traverses from the Potomac River to the Rockville city limits before branching off into the distribution network. |
More Water Pipeline Case Studies »
Sewer Force Mains
![]() |
Calgary - Force Main Structural Assessment The City of Calgary is currently planning to reverse the flow direction of two critical wastewater force mains in the city. A critical part of the study is to collect structural condition information on the pipelines and then use that information to assess the structural capacity. |
![]() |
Baltimore County - Sewer Force Main Assessment As part of Baltimore County, Maryland’s Wastewater Force Main Asessment Program, Pure Technologies inspected the 54-inch Patapsco PCCP Force Main using the SmartBall® and PipeDiver® pipeline assessment tools. |
![]() |
Grand Forks Wasterwater Authority - Sewer Force Main Assessment In late October 2008, the Grand Forks Wastewater Authority (Authority) located in Grand Forks; North Dakota initiated a project to conduct a condition assessment of an 8.8 mile 30- and 36-inch wastewater force main. |
More Sewer Force Main Case Studies »
Oil Pipelines
![]() |
Pure Technologies (Pure) has conducted two inspections of a 12-inch mutli-phase product pipeline in eastern Brazil, owned by Petrobras. Pure utilized its 10” Polyurethane coated SmartBall leak detection tool to detect a total of three simulated leaks during two separate runs on this pipeline. |
![]() |
Plains Midstream - Leak Detection Pure Technologies (Pure) conducted several successful inspection simulations with Plains Midstream before the client progressed to a series of commercial inspections. |
Gas Pipelines
![]() |
TransCanada Pipelines - Leak Detection Pure Technologies completed a demonstration inspection of a portion of the Grande Prairie Mainline gas transmission pipeline for TransCanada Pipelines. The inspection was conducted as a trial of the capabilities of the SmartBall leak detection tool in gas pipelines. |
Bridges
![]() |
Fred Hartman Bridge - Structural Monitoring After the Fred Hartman Bridge was completed in 1995, large-amplitude vibrations of the cables were observed. Following comprehensive testing, TxDOT installed a SoundPrint® Acoustic Monitoring System to monitor any wire break activity occuring within the stays. |
![]() |
Waldo-Hancock Bridge - Structural Monitoring In order to ensure the future safety of the bridge, Maine DOT commissioned Pure Technologies to install a SoundPrint® acoustic monitoring system to detect and locate any future wire breaks. The SoundPrint system utilized wireless sensors to monitor both main cables from anchorage to anchorage. |